Abstract
An initial step towards a prescriptive theory (a set of concepts) to inform the elimination of waste on construction projects. The ultimate intention is to identify the most important types and causes of waste in construction and outline the principal causal relations between them. This is not a straightforward process: the relationships form a complex network of chains and cycles of waste. Waste is defined as the use of more resources than needed, or an unwanted output from production. A conceptual schema of Previous Production Stage > Production Waste > Effect Waste is proposed and applied to the causal analysis of two major types of waste: material waste and making do.
Library
Documents
Statistics
Downloads
Downloads per month over past year