Computing and Library Services - delivering an inspiring information environment

Exploring the Recurrent Problems in the Last Planner Implementation on Construction Projects

Dave, Bhargav, Hämäläinen, Juho-Pekka and Koskela, Lauri (2015) Exploring the Recurrent Problems in the Last Planner Implementation on Construction Projects. In: Proceedings of the Indian Lean Construction Conference (ILCC 2015), February 6-7, 2015, Mumbai, India.

[img] PDF
Restricted to Repository staff only

Download (165kB)


Traditionally, production control on construction sites has been a challenging area, where the ad-hoc production control methods foster uncertainty - one of the biggest enemies of efficiency and smooth production flow. The Last Planner System® has been one of the most popular lean construction tools that offers a solution to tackle the problems of production management on construction sites. Since its inception almost 20 years ago, construction companies across the world have implemented Last Planner with reported success. However, there have also been reports of challenges in a number of areas whilst implementing the Last Planner. These challenge areas limit the effectiveness of Last Planner if not tackled properly. Some of the biggest challenges appear to be partial implementation of Last Planner; lack of standardised flow of reporting between shorter planning functions such as weekly and daily planning to long range plans (i.e. Phase and Master plans); lack of attention to long range plans; inability to deploy the collaborative aspects and lack of recognition of information systems. In this paper some of these challenges are explored through review of past literature and also through direct observation of Last Planner implementations. The challenges are categorised in two major areas and potential solution candidates are presented.

Item Type: Conference or Workshop Item (Paper)
Subjects: T Technology > TH Building construction
Schools: School of Art, Design and Architecture
Related URLs:
Depositing User: Lauri Koskela
Date Deposited: 19 Mar 2015 15:35
Last Modified: 01 Dec 2015 16:05


Downloads per month over past year

Repository Staff Only: item control page

View Item View Item

University of Huddersfield, Queensgate, Huddersfield, HD1 3DH Copyright and Disclaimer All rights reserved ©