Computing and Library Services - delivering an inspiring information environment

Design process planning and control : last planner system adaptation

Wesz, Josana, Formoso, Carlos and Tzortzopoulos, Patricia (2014) Design process planning and control : last planner system adaptation. In: 21st Annual Conference of the International Group for Lean Construction 2012. Curran Associates, pp. 369-378. ISBN 9781632660183

[img] PDF - Accepted Version
Restricted to Repository staff only

Download (147kB)


Many companies are seeking to improve their design process through the application
of lean principles. However, to implement lean concepts effectively, companies must
first achieve basic design process stability by controlling variability and increasing
reliability, which the Last Planner System (LPS) helps to accomplish. This study aims
to better understand the application of the LPS in design and to propose an adaptation
for the design of prefabricated steel construction systems for fast projects, through a
case study carried out in a steel fabricator company. This research work was divided
into three main stages. First, LPS was applied with two design teams, and an
adaptation of the LPS for the specific context of the company was proposed. Second,
the refined LPS was implemented in four additional design teams. Finally, an
evaluation of the implementation process, based on a set of design planning and
control practices was conducted, and a design planning and control model was
proposed. The main impacts of the implementation were an increase in process
transparency, stronger commitment in the delivery of packages, and collaborative
decision-making. The paper also discusses some of the difficulties in terms of
implementing medium-term planning, due to the complexity of the process.

Item Type: Book Chapter
Subjects: N Fine Arts > NX Arts in general
Schools: School of Art, Design and Architecture
Related URLs:
Depositing User: Sharon Beastall
Date Deposited: 19 Jun 2014 12:12
Last Modified: 05 Nov 2015 23:48


Downloads per month over past year

Repository Staff Only: item control page

View Item View Item

University of Huddersfield, Queensgate, Huddersfield, HD1 3DH Copyright and Disclaimer All rights reserved ©